MMC UAE / Product catalog

Mission Critical Power Systems

Explore ATTOM UPS, telecom power and battery energy storage systems. Discuss load capacity, runtime and site requirements with MMC UAE.

ATTOM distributor · UAE · Saudi Arabia (KSA) · Qatar · Stock in Dubai · 4–8 week lead time · Warranty & AMC in Dubai

Critical power products: separate load rating from backup duration

Critical power equipment should be compared against the event it must cover and the load that must remain available. MMC UAE supplies ATTOM UPS, telecom power and related infrastructure for UAE, KSA and Qatar projects. A product rating is one input to a coordinated electrical design that also considers distribution, isolation, maintenance and environmental conditions.

UPS equipment can bridge supply interruptions or support a controlled shutdown when configured for the requirement. Battery runtime depends on load, selected batteries and design conditions; the kVA rating alone does not state how long equipment will run. Modular configurations need to be assessed in the intended redundancy arrangement, including the capacity available during maintenance.

Telecom power systems serve equipment with defined supply requirements and may involve DC distribution and battery autonomy. Energy storage systems introduce another set of energy, power-conversion and operating questions. Do not assume that a published energy capacity in kWh establishes the available power in kW or that a UPS battery specification applies to a BESS.

Use the table to separate equipment purposes before comparing models. Product pages describe the documented options, while a quotation should identify the selected rating, batteries, bypass, monitoring and any associated service work. Ask which performance data supports the proposed load and backup duration. Include future growth as an explicit design input rather than leaving it as an undocumented allowance.

For a Dubai or Abu Dhabi installation, review the incoming supply, single-line drawing, cable routes, battery environment and service access. A live replacement needs an approved switching and cutover procedure. Regional supply to Saudi Arabia or Qatar should state the receiving, installation and commissioning responsibilities.

Handover should leave operators with an equipment schedule, settings, battery records where relevant and isolation instructions. Maintenance requirements differ across power families, so define inspections, battery assessment, consumables and response coverage for the actual equipment. Confirm model availability and the technical proposal before committing to an installation date.

Compare formats and project interfaces
OptionBest considered forCheck before selection
UPSRide-through and controlled shutdown for critical AC loadskW/kVA, runtime, bypass and distribution
Telecom powerEquipment with a defined telecom supply interfaceAC/DC requirements, autonomy and environment
Energy storageA specified energy and power-conversion use casekWh, PCS kW, chemistry and project approvals

3 products

Products in this selection

AgilePower BESS Battery Energy Storage UAE — product image
Product

AgilePower BESS – Battery Energy Storage Systems

AgilePower BESS is ATTOM's battery energy storage range from 215 kWh to 3,440 kWh for industrial, commercial, grid and power-plant use.

Explore details ↗
AgilePower Telecom Power System - 19-inch rack mount DC power system with hybrid AC/DC compatibility for telecom infrastructure
Product

AgilePower Telecom DC Power System

AgilePower telecom power systems are 19-inch rack-mount −48 VDC power frames with hot-swappable 2–4 kW rectifier and solar modules, intelligent battery management and remote monitoring.

Explore details ↗
AgilePower UPS rack-mounted online double conversion system for data centers and critical infrastructure
Product

AgilePower UPS – Online & Modular UPS Systems

Online double-conversion UPS from 1 to 600 kVA in rack, tower and hot-swappable modular formats, with VRLA or lithium batteries.

Explore details ↗
A little more clarity

Frequently asked questions

Useful answers to help you plan your next step.

Discuss your requirements ↗
Does UPS kVA specify runtime?

No. Runtime must be checked for the chosen battery configuration, critical load and design conditions.

Can BESS capacity be compared directly with UPS capacity?

Distinguish stored energy in kWh from power in kW and from the supported operating function. Confirm the exact system data.

What is needed for a critical power quotation?

Provide the load schedule, supply arrangement, runtime or autonomy objective, site conditions and maintenance constraints.

Talk to MMC UAE

How can we help?

Contact our team about products, installation or ongoing support.

14th Floor, Tamani Arts Building, Business Bay, Dubai

Send an enquiry


    Phone number