IT infrastructure & integration / UAE

Virtualization and HCI

Plan a virtualization refresh or move to hyperconverged infrastructure around actual workload usage. Compare consolidation and availability options, then sequence migration around application dependencies.

Virtualization and HCI migration based on measured workloads

Virtualization and hyperconverged infrastructure can simplify an estate, but consolidation changes failure domains and shared resource demand. MMC UAE scopes platform selection and migration from the workload inventory, utilisation and availability objectives. Record CPU, memory, storage behaviour and network dependencies rather than sizing hosts from the number of virtual machines alone.

Capture supported operating systems, application constraints and licensing terms that affect the design. Some workloads need vendor confirmation before a platform change. Identify physical dependencies such as dongles, specialised interfaces or backup integrations early enough to influence the migration plan.

Design capacity for normal operation and maintenance

The proposed cluster should be assessed both at expected load and during the agreed failure or maintenance condition. Reserve usable capacity for that operating case. Storage capacity should distinguish raw space, resilience overhead and usable space; performance also depends on the workload and implementation.

For HCI, coordinate compute, storage and network requirements with the selected platform. Validate switching, supported hardware, software versions and recovery arrangements. A bill of materials should identify licences, subscriptions, migration tools and support entitlements alongside physical equipment. Supporting rack power and cooling must match the consolidated installation.

Pilot migration, rollback and operations handover

Start with representative workloads that can validate the migration method without exposing the most critical service first. Define backup checkpoints, data synchronisation, application checks and the point at which rollback is no longer simple. Use application owners to confirm service behaviour after the move.

UAE maintenance windows and remote access approvals should be included in the schedule. Handover needs cluster diagrams, capacity assumptions, configuration records, support contacts and recovery procedures. Ask for relevant migration references and an example acceptance plan when evaluating delivery capability. An illustrative consolidation can reduce the number of hosts while increasing the importance of shared storage; the resulting resilience must be tested, not assumed.

Service scope

What we can help you plan

Workload sizing

Use host and VM utilization to size compute, memory and storage.

Platform design

Compare cluster layout, availability needs and growth options.

Migration planning

Group applications by dependency and agree validation and rollback steps.

Next steps

Explore related services

Project locations

Planning a project in Dubai or Abu Dhabi?

A little more clarity

Frequently asked questions

Useful answers to help you plan your next step.

Discuss your requirements ↗
Can all physical servers be virtualized?

Check application support, operating system compatibility, licensing and hardware dependencies. Some workloads may require another approach.

How much spare cluster capacity is needed?

Size against the agreed failure and maintenance conditions, growth and measured workload demand rather than a universal percentage.

What should a migration pilot prove?

Validate data movement, application behaviour, backup integration, performance and the rollback procedure for a representative workload.

Is HCI the same as backup?

No. Platform resilience and snapshots do not replace an independently designed backup and recovery plan.

Talk to MMC UAE

Tell us about your project.

Share your requirements so we can discuss the right next step for your site.