Data Center Solutions
For a constrained building fit-out, check the delivery path, floor loading and space for heat rejection early.
Planning a fit-out, server room upgrade or IT move in Dubai? Start with your building access, utility availability and handover dates. MMC UAE’s office is in Business Bay.
Power, cool and monitor facilities from edge racks to AI data halls.
For a constrained building fit-out, check the delivery path, floor loading and space for heat rejection early.
Confirm loading bay dimensions and the route from unloading point to final placement before selecting a module.
For a retrofit, verify available power per rack and whether the building can support the required heat rejection.
Check condenser placement and routing options when upgrading cooling in an occupied building.
For a live retrofit, confirm panel access and which loads can tolerate a short cutover.
For a shared building, identify which readings come from your equipment and which are managed by the landlord.
For small installations in occupied buildings, check heat, noise and access constraints near users or tenants.
For rooftop or plant-room equipment, confirm access, delivery restrictions and available utility connections.
Design, connect and migrate the systems that run your business.
For an office fit-out, align rack and cabling layouts with the building handover schedule.
Confirm floor access, riser permissions and fit-out handover dates before freezing outlet locations.
For an office move, confirm carrier handover, cabinet readiness and device moves before scheduling cutover.
For an occupied server room, identify rack, power and network capacity to run old and new hosts during migration.
For a storage refresh, check whether the site can house old and new arrays during migration.
For a fit-out or relocation, share the lease handover dates, building constraints and readiness of utility connections.
When several fit-out vendors are involved, assign responsibility for shared interfaces before scheduling handover.
Plan visibility and controls for facilities, networks and sensitive data.
For a retail or office fit-out, agree camera positions with ceiling and cabling plans and confirm applicable approvals separately.
For a shared office or hosted environment, document who owns identity, endpoints and logging before changing controls.
For a mix of office and cloud systems, confirm who controls log access for each tenant or platform.
Map which teams manage databases, hosted services and backups before agreeing monitoring access.
Define how to monitor, maintain and recover critical infrastructure.
List office hours, after-hours access arrangements and systems shared with other providers.
If site access is needed, provide the building access process and workable maintenance windows.
For shared server rooms, identify which systems are managed by your team and which are vendor-managed.
For an office with managed carrier equipment, clarify where your network ends and the provider takes over.
For office systems with narrow maintenance windows, check whether backups can finish without affecting working hours.
Useful answers to help you plan your next step.
Discuss your requirements ↗Browse data center, power and cooling, networking, security, systems integration and managed IT services. Choose the service closest to your requirement, or share a brief if your project spans several areas.
Share the site location, current infrastructure, business objectives, target dates and access constraints. For an operating site, include the systems that must remain available during any proposed work.
Yes. List each site and the services required at each location. Include any shared systems, rollout sequence and handover requirements so the team can discuss a coordinated scope.
Contact our team about products, installation or ongoing support.
14th Floor, Tamani Arts Building, Business Bay, Dubai
Data Center & IT Services in Dubai