Topology and switching
Map access and core switching, endpoint needs and physical connections.
For a distributed network, document inter-site links and which sites must keep working if the WAN is unavailable.
Build or refresh the network that connects users, systems and sites. Plan switching, uplinks and segmentation against application traffic, device counts and the impact of a link or switch failure.
Map access and core switching, endpoint needs and physical connections.
Review uplink demand and how traffic should be separated.
Identify failover paths and set a practical cutover sequence.
Useful answers to help you plan your next step.
Discuss your requirements ↗Inventory port use, uplink speeds, VLANs and devices that need Power over Ethernet. Check which links and applications must stay online during cutover.
Share Existing topology, user and device counts, uplink capacity, segmentation requirements. Include your target completion date and any existing equipment or consultant specifications so we can review the scope.
Tell us which systems must remain available, your permitted maintenance windows and any access restrictions. Migration, testing and handover requirements need to be agreed before work is scheduled.
For a distributed network, document inter-site links and which sites must keep working if the WAN is unavailable. Share the site address and building access requirements so the team can discuss the next steps.
Share your requirements so we can discuss the right next step for your site.
14th Floor, Tamani Arts Building, Business Bay, Dubai
Network Infrastructure Services in Abu Dhabi