Fortra partner / Email security

Fortra ICAP Gateway in UAE

Inspect content within proxy and file transfer workflows. MMC UAE provides product licensing and related services for organizations in Dubai, Abu Dhabi and across the UAE.

Connect content inspection to the service that requests it

Fortra ICAP Gateway is an integration enquiry for content inspection through a supported requesting system, such as an appropriate proxy or file-transfer workflow. The requirement begins with the content transaction and the decision the requesting application must receive. An ICAP interface alone does not establish compatibility with every upstream product or every file type.

Identify the requester, supported versions, content formats and expected traffic. Decide how allowed, blocked, altered or uninspected content should be represented in the business process. The surrounding service owner must understand what happens when inspection cannot finish within the permitted operating conditions.

Test both the content decision and its failure path

Confirm current Fortra support, integration options and resource requirements for the selected deployment. Use approved test material to validate the requesting application's interpretation of results. Include unsupported or encrypted content and an unavailable inspection service, because these cases can expose differences between the intended policy and the actual workflow.

Document who owns the inspection rules and who owns the upstream service. A false-positive block needs an operational route for review, while any bypass needs a narrow approval and audit process. Handover should include connection settings, timeout or failure decisions, content-policy scope and recovery instructions. A throughput target should be tested for the chosen content mix and configuration rather than copied from a generic network rating.

Evidence to request for this scope

  • Obtain compatibility evidence for the requester, ICAP configuration and required content types.
  • Test allowed, prohibited and uninspected samples through the complete requesting workflow.
  • Validate the approved response to timeout, unavailable service and mistaken content rejection.

Product references

Continue exploring

Related products and services

All Fortra products & services ↗

Manufacturer product information ↗

A little more clarity

Frequently asked questions

Useful answers to help you plan your next step.

Discuss your requirements ↗
Can ICAP inspection be treated as independent of the upstream application?

No. The requester must interpret and act on inspection results correctly. Acceptance should validate the complete business transaction.

Talk to MMC UAE

How can we help?

Contact our team about products, installation or ongoing support.

14th Floor, Tamani Arts Building, Business Bay, Dubai

Send an enquiry

Fortra ICAP Gateway


    Phone number