AgileCub Prefab Data Center for AI Video Analysis of Kunming Smart City
Project Background
In a very short period of 60 days, the Kunming Smart City project needed to go live. The project included high-density video surveillance and analytical computing, requiring carefully designed, high-grade data centers to secure and support this core business. The project deployment space was extremely tight and had to be matched to the right solution for the site.
Project High-lights
Perfect service area for AI video analysis servers with 3 meters wide container
Reliable protection with modular UPS system N+1 hot swappable modules
Excellent PUE performance InRow cooling and hot aisle Containment
Easy remote monitoring and management with all in one local DCIM system
One-stop project delivery within 45 days including design, fabrication, installation and commissioning
20 years working life with stainless steel for floor and wall
AglieCub Product Details
2 sets 40F / 3M wide tailored container data centers
150kVA modular UPS N+1 Redundancy in each DC
Inrow cooling 4x 30kW N+1 Redundancy in each DC
Hot aisle containment system with auto drop top panel
Automatic fire fighting system with FM200 fire agent
IP55 dust and water proof protection level
3 in 1 access control system with remote management
16 sets IT rack 0.6m(W) x 1.2m(D) x 42U(H) in each